Granny flats without building consent in NZ: the 2026 rules, explained

Wingspan Homes buyer guide · 2026 · 9 min read

Since 15 January 2026, New Zealand homeowners can build a small, self-contained granny flat of up to 70 m² without a building consent, as long as the build meets a clear set of conditions. Here is what the exemption covers, what it does not, and how a factory-built home fits into it.

What changed in 2026

The Building Act was changed to add a new exemption for small stand-alone dwellings, commonly called the granny flat exemption. It took effect on 15 January 2026. Before this, any self-contained second dwelling on your property needed a full building consent, which often meant months of waiting and thousands of dollars in fees before anything could be built.

The exemption does not remove the rules about how the home is built. It removes the consent process, and replaces it with a lighter path: you tell the council before you build, and you send the paperwork when it is finished.

The conditions at a glance

ConditionWhat it means in practice
Size70 m² or smaller, including any internal garage
StoreysSingle storey only
Stand-aloneA new detached building, not an extension or a conversion of an existing building
Self-containedSomewhere to cook, sleep, live, wash and use a toilet
DistanceAt least 2 m from other buildings and from property boundaries
Who does the workDesigned and built, or supervised, by licensed building practitioners; plumbing, drainage, electrical and gas by licensed tradespeople
ConstructionLightweight steel or timber framing, lightweight roof, wall cladding no heavier than 220 kg/m²
ShowersNo level-entry or wet-floor showers; prefabricated shower units are typical
HeatingNo solid-fuel heater
Before you buildApply for a Project Information Memorandum (PIM) from your council
After you buildSend final plans, records of work and safety certificates to the council within 20 working days
Councils publish their own fees and checklists for this exemption. As an example, one council lists a PIM fee of around $660 for a small stand-alone dwelling. Check your own council's page before you start.

Building consent is not the same as resource consent

This is the part most people miss. The exemption covers building consent. Your district plan and the national planning rules still apply to where the dwelling sits on your land. Depending on your zone, setbacks, site coverage limits or other planning rules can still require a resource consent.

Before you order anything, ask your council two questions: does my site qualify for the building consent exemption, and does my zone need a resource consent for a second small dwelling? The PIM is the natural place to get both answers in writing.

Costs that still apply

CostWhenNotes
PIM feeBefore buildingSet by your council
Development contributionsAt completionSet by unit size and zone; the council confirms at PIM stage
Licensed tradesDuring the buildElectrician, plumber and drainlayer certify their own work
Site worksBefore deliveryFootings, access, service trenches
Resource consent (if needed)Before buildingOnly if your zone requires it

Where an expandable home fits

A 20 ft expandable home opens to roughly 5.9 x 6.3 m, about 37 m², and a 40 ft home to about 11.8 x 6.3 m, around 74 m². That means a 20 ft and 30 ft home sit comfortably inside the 70 m² cap, while a 40 ft home sits right at the edge and needs its exact floor area checked against your council's measurement method before you rely on the exemption.

HomeApprox. floor areaUnder 70 m²?
Folding Cabin 20about 18 m²Yes (usually used as a sleepout or office, not a full dwelling)
Wingspan 20about 37 m²Yes
Wingspan 30about 55 m²Yes
Wingspan 40about 74 m² externalCheck: very close to the cap

Factory-built homes are made with steel framing and lightweight panels, which lines up with the construction conditions. What you still need locally is the licensed work: foundations, the connection of power, water and drainage, and the certificates that prove it was done right. We give you the floor plan and full specification to hand to your council and trades.

A sensible order of steps

  1. Check the rules for your site. Read your council's granny flat page and apply for a PIM.
  2. Pick the size. Match the floor area to the 70 m² cap and your site setbacks.
  3. Line up local trades. Electrician, plumber and drainlayer, plus someone for footings.
  4. Get a written quote for the home delivered to your site, with the plan and spec.
  5. Prepare the site while the home is being built and shipped.
  6. Delivery, placement and connection.
  7. Send the completion documents to council within 20 working days.

Official sources

This guide is general information to help you plan. Rules change and every site is different, so always confirm with your local council, licensed trades and the official sources linked in this guide before you commit.