Getting your site ready: the complete delivery and placement checklist
Wingspan Homes buyer guide · 2026 · 7 min read
A smooth delivery day is decided weeks before the truck arrives. This checklist covers access, ground, footings, services and the day itself, so your home is lifted into place and opened without surprises.
Access: can the truck and crane get in?
Check
What to look for
Road to your gate
Firm, wide enough for a truck carrying a 20 or 40 ft unit
Gate width
At least about 3.5 m clear is a good guide
Overhead
Power lines, trees and roof eaves near the lift area
Turning space
Room for the truck to position next to the spot
Crane position
A firm, level pad for the crane close to the placement spot
Ground
Dry and firm on the day; soft ground may need matting
Send us a few photos of your access and the placement spot when you request a quote. We'll flag anything that needs checking before you commit.
The spot itself
Level ground, or footings that make it level
Clear of overhead lines and branches
Allowing the setbacks your council requires (for granny flats in NZ, at least 2 m from boundaries and other buildings)
Space around the unit for the walls to open out: an expandable home needs the full opened width, not just the folded width
Footing options compared
Footing
Good for
Notes
Concrete pads / blocks
Most level sites
Quick and low cost
Timber or steel piles
Sloping or uneven ground
Common in NZ; set by a local builder
Screw piles
Soft ground, fast installs
Minimal digging
Concrete slab
Permanent placement
Highest cost, not usually needed
Opened sizes to plan around
Model
Folded (transport)
Opened
Folding Cabin 20
about 5.9 x 2.4 m
same footprint, unfolded upwards
Wingspan 20
5.9 x 2.2 m
5.9 x 6.3 m
Wingspan 30
about 9 x 2.2 m
about 9 x 6.3 m
Wingspan 40
11.8 x 2.2 m
11.8 x 6.3 m
Services
Service
Who connects it
Tip
Power
Registered electrician
Plan the cable route from your main board early
Water
Licensed plumber
Network supply or tank
Wastewater
Licensed drainlayer
Sewer connection or an approved on-site system
Stormwater
Drainlayer / plumber
Where roof water will go
Delivery day
The truck arrives and positions next to the spot.
The crane lifts the folded unit onto the footings.
The unit is levelled and opened out.
Your trades connect power, water and drainage, usually over the following days.
You check the home, and only then make the final payment.
This guide is general information to help you plan. Rules change and every site is different, so always confirm with your local council, licensed trades and the official sources linked in this guide before you commit.