Buying a home that is built overseas is a big step, and the moment you pay a deposit is the moment most people worry about. This guide sets out what a trustworthy seller should give you at every stage, so you can judge any supplier, including us.
The rule that protects you
You should never pay the full price for something you have not seen. A safe purchase is split into stages, and each payment is released only against proof that the previous stage is done. At Wingspan Homes that split is 30 / 50 / 20, and the final 20% is paid only once the home is on your land.
Stage by stage
| Stage | What happens | What you receive | What you pay |
|---|---|---|---|
| 1. Agreement | We confirm the model, layout, add-ons, delivery address and timeline | A written agreement with the plan, specification, price and dates | Nothing yet |
| 2. Production starts | Your home is scheduled on the production line | Confirmation that production has started | 30% |
| 3. During the build | Frame, panels, windows, kitchen and bathroom are fitted | Photos and video of your actual unit | Nothing |
| 4. Inspection | The finished unit is checked before it is folded | An inspection photo report of your unit | 50% |
| 5. Shipping | The home is folded, loaded and shipped | Shipping documents and the vessel details | Nothing |
| 6. Customs & delivery | Clearance at the port, then trucking to your site | Delivery date confirmed with you | Nothing |
| 7. On your site | Lifted into place and opened out | Your home | Final 20% |
Red flags when buying any prefab home
| Red flag | Why it matters |
|---|---|
| Full payment up front | You carry all the risk and have no leverage if something goes wrong |
| No written agreement | Nothing to hold the seller to on size, spec or dates |
| Only renders, no real footage | Renders can't show build quality; real photos and video of real units can |
| A price with no inclusions list | The cheap headline price often excludes shipping, delivery or placement |
| Pressure to decide today | A fair seller gives you time to check the council rules and your site |
| No photos of your own unit | You should see the actual home you are paying for before it ships |
Questions to ask before paying anything
- What exactly is included in the price, and what is not?
- Will I get photos and video of my own unit during the build?
- Who inspects it before it ships, and will I see the report?
- When do I pay the final amount: before or after it arrives?
- What warranty comes with it, and what does it cover?
- What documents will I get for my council and my electrician?
If a seller can't answer these clearly and in writing, keep looking.
Timeline you can expect
| Step | Typical time |
|---|---|
| Quote and agreement | 1 to 3 days |
| Production | 3 to 6 weeks |
| Inspection and loading | about 1 week |
| Sea freight | about 3 to 5 weeks, depending on port |
| Customs and delivery | about 1 to 2 weeks |
| Placement on site | about a day |
From signed agreement to a home on your land is usually 9 to 13 weeks. Your actual dates are written into your agreement.
This guide is general information to help you plan. Rules change and every site is different, so always confirm with your local council, licensed trades and the official sources linked in this guide before you commit.