Getting your site ready: the complete delivery and placement checklist

Wingspan Homes buyer guide · 2026 · 7 min read

A smooth delivery day is decided weeks before the truck arrives. This checklist covers access, ground, footings, services and the day itself, so your home is lifted into place and opened without surprises.

Access: can the truck and crane get in?

CheckWhat to look for
Road to your gateFirm, wide enough for a truck carrying a 20 or 40 ft unit
Gate widthAt least about 3.5 m clear is a good guide
OverheadPower lines, trees and roof eaves near the lift area
Turning spaceRoom for the truck to position next to the spot
Crane positionA firm, level pad for the crane close to the placement spot
GroundDry and firm on the day; soft ground may need matting
Send us a few photos of your access and the placement spot when you request a quote. We'll flag anything that needs checking before you commit.

The spot itself

  • Level ground, or footings that make it level
  • Clear of overhead lines and branches
  • Allowing the setbacks your council requires (for granny flats in NZ, at least 2 m from boundaries and other buildings)
  • Space around the unit for the walls to open out: an expandable home needs the full opened width, not just the folded width

Footing options compared

FootingGood forNotes
Concrete pads / blocksMost level sitesQuick and low cost
Timber or steel pilesSloping or uneven groundCommon in NZ; set by a local builder
Screw pilesSoft ground, fast installsMinimal digging
Concrete slabPermanent placementHighest cost, not usually needed

Opened sizes to plan around

ModelFolded (transport)Opened
Folding Cabin 20about 5.9 x 2.4 msame footprint, unfolded upwards
Wingspan 205.9 x 2.2 m5.9 x 6.3 m
Wingspan 30about 9 x 2.2 mabout 9 x 6.3 m
Wingspan 4011.8 x 2.2 m11.8 x 6.3 m

Services

ServiceWho connects itTip
PowerRegistered electricianPlan the cable route from your main board early
WaterLicensed plumberNetwork supply or tank
WastewaterLicensed drainlayerSewer connection or an approved on-site system
StormwaterDrainlayer / plumberWhere roof water will go

Delivery day

  1. The truck arrives and positions next to the spot.
  2. The crane lifts the folded unit onto the footings.
  3. The unit is levelled and opened out.
  4. Your trades connect power, water and drainage, usually over the following days.
  5. You check the home, and only then make the final payment.

This guide is general information to help you plan. Rules change and every site is different, so always confirm with your local council, licensed trades and the official sources linked in this guide before you commit.